ANALYSIS AND MITIGATION OF DELAY RISKS IN THE CONSTRUCTION OF THE CENTRAL SURGICAL INSTALLATION BUILDING USING THE HOUSE OF RISK METHOD
Delay Risk Mitigation in Surgical Building Construction
DOI:
https://doi.org/10.55766/sujst8738Keywords:
Construction Project, House of Risk, Mitigation, Project DelayAbstract
One of the ongoing construction projects in Banda Aceh City is the Central Surgical Installation Building at Meuraxa Regional General Hospital. However, based on contractor observations, this project has experienced delays beyond the planned schedule. This study identifies the factors contributing to these delays using the House of Risk (HOR) method and explores mitigation strategies. The research involved a questionnaire survey with 20 respondents, which included contractors and supervising consultants. The study examined six key delay factors: planning and scheduling (E1), work documents (E2), control systems (E3), resource readiness (E4), financial delays (E5), and material delays (E6). The HOR Phase 1 analysis identified three primary risk agents: inaccurate project specifications (A1) with an ARP value of 180, slow administrative processes (A2) with 128, and unreliable cost estimation (A3) with 108, all contributing significantly to project delays. In HOR Phase 2, five mitigation strategies were proposed, including improving communication with the project owner (PA1), expediting administrative processes (PA2), developing a detailed cost estimation framework (PA3), optimizing material procurement and supplier coordination (PA4), and allocating additional workforce and equipment (PA5). These actions aim to minimize risks and enhance project efficiency. By implementing these mitigation strategies, construction delays can be effectively reduced, ensuring timely project completion. This study highlights the importance of structured risk management in construction projects and provides valuable insights for contractors, project managers, and policymakers.
References
Al-Attabi, A.M.A.N. (2025). Toward delay mitigation in Iraqi construction project: Evaluating the causes and the implications. Ain Shams Engineering Journal, 16(10):103598. https://doi.org/10.1016/j.asej.2025.103598
Almashhour, R., Al-Mhdawi, M.K.S., Daghfous, A., Qazi, A., and Ojiako, U. (2025). Traditional to sustainable risk management in the construction industry: A systematic literature review. International Journal of Managing Projects in Business, 18(3):528-565. https://doi.org/10.1108/IJMPB-01-2025-0021
Alrasheed, K., Soliman, E., and Albader, H. (2023). Systematic review of construction project delays in Kuwait. Journal of Engineering Research, 11(4):347-355. https://doi.org/10.1016/j.jer.2023.08.009
Al-Tameemi, K.S. (2025). The impact of schedule compression techniques on construction project timelines: A case study in Basrah, Iraq. The Open Civil Engineering Journal, 19. https://doi.org/10.2174/0118741495360335241205110710
Amaechi, C.V., Reda, A., Beddu, S.B., Mohamed, D.B., Syamsir, A., Ja’e, I.A., Ullah, S., Xiaopeng, D., Huang, B., Wang, C., and Ju, X. (2025). A systematic literature review on knowledge for project risk management in construction. Journal of Building Engineering, 114:114261. https://doi.org/10.1016/j.jobe.2025.114261
Bruni, M.E., and Hazir, Ö. (2024). A risk-averse distributionally robust project scheduling model to address payment delays. European Journal of Operational Research, 318(2):398-407. https://doi.org/10.1016/j.ejor.2024.05.037
Chou, J.-S., Lin, T.-Y., Molla, A., and Lin, C.-C. J. (2025). Advanced risk management strategies for safety enhancement in temporary building construction works. Journal of Safety Research. https://doi.org/10.1016/j.jsr.2025.08.003
Daoud, A.O., El Hefnawy, M., and Wefki, H. (2023). Investigating of critical factors affecting cost overrun and delays in Egyptian mega construction projects. Alexandria Engineering Journal, 83:326-334. https://doi.org/10.1016/j.aej.2023.10.052
Das, D.K. (2024). Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6):1423-1438. https://doi.org/10.1108/IJBPA-08-2023-0109
Hadi, J.A., Febrianti, M.A., Yudhistira, G.A., and Qurtubi, Q. (2020). Identifikasi risiko rantai pasok dengan metode House of Risk (HOR). Performa: Media Ilmiah Teknik Industri, 19(2):85-94. https://doi.org/10.20961/performa.19.2.46388
Hosseini, K., and Javid, Y. (2025). Enhancing risk assessment in sustainable construction projects: A hybrid neutrosophic-based decision making framework. Journal of Cleaner Production, 525:146395. https://doi.org/10.1016/j.jclepro.2025.146395
Irfanto, R., and Charolin, E. (2024). Implementasi prinsip pareto pada pekerjaan perbaikan di proyek perumahan (Studi kasus: Proyek Perumahan di Kota Tangerang Selatan). Indonesian Journal on Construction Engineering and Sustainable Development, 7(1):47-53. https://doi.org/10.25105/cesd.v7i1.20264
Kim, S.H., and Kim, Y.S. (2025). Quantitative analysis of schedule impact due to design changes in finishing construction work: A case study of office buildings. KSCE Journal of Civil Engineering, 100362. https://doi.org/10.1016/j.kscej.2025.100362
Kumar, M., and Kumari, S. (2025). Causes of delays in road construction projects: A systematic review. Journal of Financial Management of Property and Construction, 30(2):256-294. https://doi.org/10.1108/JFMPC-01-2023-0004
Liou, J.J.H., Chien, C.-W., Chang, F.-C., and Chuang, Y.-C. (2026). Integrating FMEA and HFACS to assess the risk to airport operations. Journal of Air Transport Management, 131:102902. https://doi.org/10.1016/j.jairtraman.2025.102902
Nadeem, M., Jiskani, I.M., Urwat, M.S., Uddin, S., Akhtar, K., and Khokhar, N.H. (2023). Analysing delay factors in construction projects using Z-number approach: Insights from Pakistan. Canadian Journal of Civil Engineering, 50(12):966-983. https://doi.org/10.1139/cjce-2022-0310
Pregina, K., and Kannan, M.R. (2024). Fuzzy-graphical evaluation and review technique for scheduling construction projects. KSCE Journal of Civil Engineering, 28(7):2573-2587. https://doi.org/10.1007/s12205-024-0904-z
Rahim, M.S.A., Reniers, G., Yang, M., and Bajpai, S. (2024). Risk assessment methods for process safety, process security and resilience in the chemical process industry: A thorough literature review. Journal of Loss Prevention in the Process Industries, 88:105274. https://doi.org/10.1016/j.jlp.2024.105274
Rani, H.A., Amin, J., Syuhada, R., Mubarak, M.H., and Aqsha, M.S. (2024). Enhancing supply chain management risk mitigation: A House of Risk methodology applied to brick manufacturing in Aceh Besar Regency. Qeios. https://doi.org/10.32388/FSJF2F.2
Salah, B., Alnahhal, M., and Ali, M. (2023). Risk prioritization using a modified FMEA analysis in industry 4.0. Journal of Engineering Research, 11(4):460-468. https://doi.org/10.1016/j.jer.2023.07.001
Shash, A.A., and Musabih, A.J. (2022). Delays in commercial buildings and their impact on stakeholders. International Research Journal of Advanced Engineering and Science, 7(4):94-102. https://irjaes.com/wp-content/uploads/2022/10/IRJAES-V7N4P70Y22.pdf
Singh, H., Nielsen, M., and Greatrex, H. (2023). Causes, impacts, and mitigation strategies of urban pluvial floods in India: A systematic review. International Journal of Disaster Risk Reduction, 93:103751. https://doi.org/10.1016/j.ijdrr.2023.103751
Tang, Y., Chen, Y., Hua, Y., and Fu, Y. (2020). Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter? International Journal of Project Management, 38(3):188-199. https://doi.org/10.1016/j.ijproman.2020.03.002
Ullah, S., Xiaopeng, D., Anbar, D.R., Amaechi, C.V., Oyetunji, A.K., Ashraf, M.W., and Siddiq, M. (2024). Risk identification techniques for international contracting projects by construction professionals using factor analysis. Ain Shams Engineering Journal, 15(4):102655. https://doi.org/10.1016/j.asej.2024.102655
Won, J.W., Jung, W., Baek, S., and Han, S.H. (2024). Probability and impact perspectives on cost and schedule risks in international construction projects: An empirical investigation. KSCE Journal of Civil Engineering, 28(7):2600-2612. https://doi.org/10.1007/s12205-024-2598-7
Xia, N., Guo, J., and Lin, Y.-H. (2021). Managing stakeholder attributes for risk mitigation: Evidence from construction project contractors. International Journal of Managing Projects in Business, 14(7):1605-1626. https://doi.org/10.1108/IJMPB-11-2020-0345
Yang, J., Arditi, D., Lee, D.-E., and Mutis, I. (2022). Delay analysis selection model for a construction project. KSCE Journal of Civil Engineering, 26(12):4926-4941. https://doi.org/10.1007/s12205-022-2394-1








