AN INVESTIGATION ON HYBRID AND NON-HYBRID PRODUCTION CONTROL SYSTEMS UNDER UNBALANCED LINE CONDITIONS: A COMPARATIVE SIMULATION STUDY

Authors

  • Krissana Kiatthanawit School of Manufacturing Systems and Mechanical Engineering, Sirindhorn Sirindhorn International Institute of Technology, Thammasat University, Thammasat University, Pathum Thani, 12121, Thailand.
  • Navee Chiadamrong School of Manufacturing Systems and Mechanical Engineering, Sirindhorn Sirindhorn International Institute of Technology, Thammasat University, Thammasat University, Pathum Thani, 12121, Thailand.

Keywords:

Hybrid and non-hybrid production control system, bottleneck process, simulation study, genetic algorithm

Abstract

Companies have been trying to maximize productivity from their available resources. Only one resource can limit the throughput of the whole system. This resource, the so called “bottleneck” causes inability of a system to respond to sudden changes in demand as a result of capacity restriction. Different production controlling mechanisms have their own way to direct materials through the system in which they can affect the speed of the flow. This study is aimed to at recommending important decision variables for controlling the material flow of both traditional non-hybrid production control systems and hybrid systems under restricted conditions as well as identifying the advantages and disadvantages of each system. Results from the study will give the best alternative for the production system under unbalanced conditions.

References

Amirghasemi, M. and Zamani, R. (2015). An effective asexual genetic algorithm for solving the job shop scheduling problem. Comput. Ind. Eng., 83(5):123-138.

Benton, W.C. and Shin, H. (1998). Manufacturing planning and control: the evolution of MRP and JIT integration. Eur. J. Oper. Res., 110:411-440.

Bonney, M.C., Zhang, Z., Head, M.A., Tien, C.C., and Barson, R.J. (1999). Are push and pull systems really so different? Int. J. Prod. Econ., 59:53-64.

Bonvik, A.M., Dallery,Y., and Gershwin, S.B. (2000). Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy. Int. J. Prod. Res., 38:2845-2869.

Browne, J., Harhen, J., and Shivnan, J. (1988). Production Management Systems. Addison-Wesley, Wokingham, UK, 284p.

Chan, W.T. and Hu, H. (2001). An application of genetic algorithms to precise production scheduling. Comput. Struct., 79:1605-1616.

Chiadamrong, N. and Limpasontipong, P. (2003). Using storage buffer to improve unbalanced asynchronous production flow line’s performance. International J. Manufact. Tech. Manage., (1-2):149-161.

Fox, R.E. (1984). Main bottleneck on the factory floor? Manag. Rev., 73(11):55-61.

Geraghty, J. and Heavey, C. (2004). A comparison of hybrid push/pull and CONWIP/pull production inventory control policies. Int. J. Prod. Econ., 91:75-90.

Goldratt, E.M. (1993). The Goal. 2nd ed. The North River Press Publishing Corporation, Great Barrington, MA, USA, 384p.

Huang, M., Wang, D., and Ip, W.H. (1998). A simulation and comparative study of the CONWIP, KANBAN and MRP production control systems in a cold rolling plant. Prod. Plan. Control, 9(8):803-812.

Jacobs, F.R. (1984). OPT uncovered: many production planning schedule concepts can be applied with or without software. Ind. Eng., 16(10):32-41.

Jodlbauer, H. and Huber, A. (2008). Service-level performance of MRP, Kanban, CONWIP, and DBR due to parameter stability and environmental robustness. Int. J. Prod. Res., 46(8):2179-2195.

Krishnamurthy, A., Suri, R., and Vernon, M. (2004). Re-examining the performance of MRP and KANBAN material control strategies for multi-product flexible manufacturing systems. Int. J. Flex. Manuf. Sys., 16(2):123-150.

Lee, L.C. (1989). A comparative study of the push and pull productions systems. Int. J. Oper. Prod. Man., 9(4):5-18.

Sun, L., Heragu, S.S., Chen, L., and Spearman, L. M. (2012). Comparing dynamic risk-based scheduling methods with MRP via simulation. Int. J. Prod. Res., 50(4):921-923.

Muris, L.J. and Moacir, G.F. (2010). Variations of the Kanban system: Literature review and classification. Int. J. Prod. Econ., 125(1):13-21.

Nahmias, S. (1997). Production and Operations Analysis. 3rd ed. McGraw-Hill International Editions, Singapore, 858p.

Pettersen, J. and Segerstedt, A. (2009). Restricted work-in-process: a study of differences between KANBAN and CONWIP. Int. J. Prod. Econ., 118(1):199-207.

Powell, G.S. (1994). Buffer allocation in unbalanced three-station serial lines. Int. J. Prod. Res., 32(9): 2201-2217.

Prasertwattana, K. and Chiadamrong, N. (2004). Purchasing and inventory policy in a supply chain under the periodic review: a single manufacturer and multiple retailers’ case. Int. J. Indus. Eng. Manage. Systems, 3(1):38-51.

Pyke, D.F. and Coden, M.A. (1990). Push and pull in manufacturing and distribution systems. J. Oper. Manag., 9:24-43.

Riezebos, J., Korte, G.J., and Land, M.J. (2010), Improving a practical DBR buffering approach using workload control. Int. J. Prod. Res., 41(4):669- 712.

Spearman, M.L., Woodruff, D.L., and Hopp, W.J. (1990). CONWIP: a pull alternative to KANBAN. Int. J. Prod. Res., 28(5):879-894.

Spearman, M.L. and Zazanis, M.A. (1992). Push and pull production systems: issues and comparisons. Oper. Res., 40(3):521-532.

Takahashi, K., Myreshka, H.D., and Hirotani, D. (2005). Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains. Int. J. Prod. Econ., 93-94:25-40.

Tardif, V. and Maaseidvaag, L. (2001). An adaptive approach to controlling Kanban systems. Eur. J. Oper. Res., l32(2):411-424.

Downloads

Published

2026-08-28

How to Cite

Kiatthanawit, K., & Chiadamrong, N. (2026). AN INVESTIGATION ON HYBRID AND NON-HYBRID PRODUCTION CONTROL SYSTEMS UNDER UNBALANCED LINE CONDITIONS: A COMPARATIVE SIMULATION STUDY. Suranaree Journal of Science and Technology, 22(4), 323–338. retrieved from https://ph04.tci-thaijo.org/index.php/SUJST/article/view/14095

Issue

Section

Research Article