TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
Keywords:
Construction Scheduling, labor resource constraints, time-cost trade-off, multi-objective optimizationAbstract
Time and cost are the main goals of the construction project management. Planners are searching for the optimal schedules which give both early completion time and small total cost. The scheduling problem named Time-Cost Trade-off (TCT) is attended by previous research. From field surveys conducted in Thailand, contractors are also concerned about the fluctuation of labor resources supply. Most construction labor is seasonal workers who work in agriculture as well. This research, therefore, formulates the TCT model with labor resource constraints. Multi-objective goal programming and binary integer programming are used in the formulation. The mathematical expressions of this model are presented in the paper. Genetic Algorithms is used to search for optimal solutions. This new model is tested with the real data collected. The result shows that the scheduling model with labor resource constraints gives earlier project finish time and less project cost than the one without.
References
Chassiakos, A.P. and Sakellaropoulos, S.P.(2005). Time-cost optimization of construction projects with generalized activity constraints. J. Constr. Engrg.and Mgmt., 131(10):1115-1124.
Elmaghraby, S.E. and Kamburowski, J.(1992). The analysis of activity networks under generalized precedence relations.Manage. Sci., 38(9):1245–1263.
Goldberg, D.E. (1989). Genetic Algorithms inSearch, Optimization, and Machine Learning. Addison Wesley Longman,USA, 412p.
Liu, L., Burns, S.A., and Feng, C.W. (1995).Construction time-cost trade-off analysis using LP/IP hybrid method. J. Constr.Engrg. and Mgmt., 121(4):446–454.
Moussourakis, J. and Haksever, C. (2004).Flexible model for time/cost trade off problem. J. Constr. Engrg. and Mgmt.,130(3):307–314.
Perera, S. (1980). Linear programming solution to network compression. J. Constr. Div.,Am. Soc. Civ. Eng., 106(3):315–326.
Ragsdale, C.T. (2004). Spreadsheet Modeling& Decision Analysis: A Practical Introduction to Management Science.4th ed. Thomson South-Western, Ohio,842p
Rardin, R.L. (1998). Optimization in Operations Research. Prentice-Hall, New Jersey,919p.
Shen, Y.S., Sung, J.C., and Gong, D.C. (2009).Genetic algorithms application to a production-inventory model of imperfect process with deteriorating items under two dispatching policies. International Joint Conference on Computational Sciences and Optimization 2009; 24-26April 2009; Hainan, R.P. China, p. 913–917.
Zheng, D.X.M., Ng, S.T., and Kumaraswamy,M.M. (2004). Applying a genetic algorithm-based multiobjective approach for time-cost optimization. J. Constr.Engrg. and Mgmt., 130(2):168–176.
Zheng, D.X.M., Ng, S.T., and Kumaraswamy, M.M. (2005). Applying pareto rankingand niche formation to genetic algorithm-based Mult objective timeñcost optimization. J. Constr. Engrg. andMgmt., 131(1):81–91.