Safety Situation and Analysis of Safety Measures for Electric Railway Construction Sites: Case Study of a Suburban Red Line Project, Bang Sue-Rangsit Section

Authors

  • Manon Sooklamai Department of Mechanical Technology Education, Faculty of Industrial Education and Technology, King Mongkut’s University of Technology Thonburi, Bangkok, Thailand
  • Sujin Jiracheewanun Department of Mechanical Technology Education, Faculty of Industrial Education and Technology, King Mongkut’s University of Technology Thonburi, Bangkok, Thailand

Keywords:

Construction, Measure, Near miss, Railway system, Safety

Abstract

Proceeding from the policy of developing and promoting international railway networks with neighborhood countries has been an expansion of the national railway system. This expansion has necessitated the establishment of many railway route construction projects. In this circumstance, the construction workforce is critical to the success of these necessary projects. However, it is vital for the effectiveness of the projects’ workforce to ensure a safe environment and mitigate risks related to the construction process during the projects. Therefore, this study focused on an investigation of project construction safety in various situations, related analysis of safety measures, and construction risk mitigation of a specific metro train route construction project, the Red Line Bang Sue-Rangsit segment, Bangkok, Thailand. Near miss incidents were a significant part of our investigation. The study collected data from 108 samples and found that there were 200 cases of near miss incidents. The case subjects for the study were divided into 6 groups, which were: 1) personnel working at heights, 2) railway installation workers, 3) crane and forklift operators, 4) heavy machinery and transportation operators, 5) personnel working in obstructed areas, and 6) Other non-specific categories of railway construction workers. Following the group identification of railway safety work categories, risk assessment and evaluation of safety measures were performed. The research determined that the group of workers with the highest risk were the personnel working at heights, especially at the Bang Sue Grand Station construction site. After reviewing the near miss incidents, it was observed that the primary causal factor involved was human behavior at the worksite. The significant contributing factors were the safety conditions in the workplace environment and the safety of standard operating procedures. Safety and Risk mitigating factors were experience, training, and clear understanding of the safety procedures and enforced worksite safety policies/rules.

References

State Railway of Thailand, 2017, Annual Report [Online], Available: http://www.railway.co.th/AboutUs/AnnualReport?value1=. [10 January 2019] (In Thai)

Estopolis, 2017, 11 Routes Electrification Railway Network in Thailand [Online], Available: https://www.estopolis.com/article/รวมผังรถไฟฟ้า-11-สาย-ที่ควรรู้. [10 January 2019] (In Thai)

Realist Blog, 2016, High speed train Thailand–China–Japan, [Online], Available: http://www.realist.co.th/blog/รถไฟความเร็วสูง/?gclid=Cj0KCQjw7sDlBRC9ARIsAD-pDF oBHbIWAzd0MRhoGlTrXbVDN_Rm-BlL wxznRjDP5YMF4wly1U2zJloaAn -tEAL w_wcB. [10 January 2019] (In Thai)

Eastern Economic Corridor Office, 2018, The High-Speed Rail Linked 3 Airport Project, [Online], Available: https://www. eeco.or.th/en/project/infrastructure-development/high-speed-train. [10 January 2019]

National Statistical Office, 2014, Construction Industry [Online], Available: http://service.nso.go.th/nso/web/survey/surbus4-1-6.html. [10 January 2019] (In Thai)

Social Security Office, Accident and Sickness from Works [Online], Available: https://www.sso.go.th/wpr/assets/upload/files_storage/sso_th/fe4bf98524ca20d6768e7ded43dabb4d.pdf. [11 January 2019] (In Thai)

Bangkokbiznews.com, Lesson Learnt from Redline, Steel Bar [Online], Available: http://www.bangkokbiznews.com/news/detail/752812. [11 January 2019] (In Thai)

National Safety Council, 2013, Near-miss Reporting Systems, Available: https:// www.atlantictraining.com/blog/wp-content/ uploads/2018/05/294734832-Near-Miss-Reporting-Systems.pdf. [11 January 2019]

Marks, E., Teizer, J. and Hinze, J., 2014, “Near Miss Reporting Program to Enhance Construction Worker Safety Performance,” Construction Research Congress, pp. 2315-2324.

Shiina, K., “A Comparative Analysis of Near-miss Falling & Slipping Incidents at Indoor and Outdoor Telecommunication Construction Sites,” The Journal of Science of Labour, 89 (4), pp. 140-148.

LI, Q., LIU, R., L., Zhang, J. and Sun, Q., 2014, “Quality Risk Management Model for Railway Construction Projects,” Procedia Engineering, 84, pp. 195-203.

Suh, S.D., 2000, Risk Management in a Large-scale New Railway Transport System Project: Evaluation of Korean High Speed Railway Experience, IATSS Research, 24 (2), pp. 53-63.

Wang, L., Li, Y. and Wang, E., 2011, “Research on Risk Management of Railway Engineering Construction,” Systems Engineering Procedia, 1, pp. 174–180.

Silvianita, M., Khamidi, M.F. and John, K.V., 2011, “Critical Review of a Risk Assessment Method and its Applications,” International Proceedings of Economics Development and Research (IPEDR), 11, pp. 83-87.

Raiyan, A., Das, S., D.M. and Islam, M.R., 2017, “Event Tree Analysis of Marine Accidents in Bangladesh,” Procedia Engineering, 194, pp. 276-283.

Rosqvist, T., Molarius, R., Virta, H. and Perrels, A., 2013, “Event Tree Analysis for Flood Protection - An Exploratory Study in Finland,” Reliability Engineering and System Safety, 112, pp. 1-7.

Leitner, B., 2017, “A General Model for Railway Systems Risk Assessment with the Use of Railway Accident Scenarios Analysis,”, Procedia Engineering, 187, pp. 150 – 159.

Department of Industrial Works, The Regularity on Hazard Identification Method, Risk Assessment, and Risk Management Planning, B.E. 2543 [Online], Available: https://www.diw.go.th/hawk/law/safety/regulation4.pdf [10 January 2019] (In Thai)

Red-line official website, Statement of problem [Online], Available: http://www.bangsue-rangsitredline.com/ [18 January 2019] (In Thai)

Social Security Office, Compensation Fund [Online], Available: https://www.sso.go.th/wpr/main/privilege/กองทุนเงินทดแทน_category_list-text-photo_1_126_0. [1 May 2019] (In Thai)

Raouf, A., Theory of Accident Causes, Encyclopedia of Occupational Health and Safety [Online], Available: http://www.ilocis.org/documents/chpt56e.htm. [10 December 2019]

Downloads

Published

2021-12-31

How to Cite

Sooklamai, M., & Jiracheewanun, S. (2021). Safety Situation and Analysis of Safety Measures for Electric Railway Construction Sites: Case Study of a Suburban Red Line Project, Bang Sue-Rangsit Section. Science and Engineering Connect, 44(4), 589–608. retrieved from https://ph04.tci-thaijo.org/index.php/SEC/article/view/10463

Issue

Section

Research Article