Rani, H., Syammaun, T., Rachman , F. and Cahyadi, A. (2025) “ANALYSIS AND MITIGATION OF DELAY RISKS IN THE CONSTRUCTION OF THE CENTRAL SURGICAL INSTALLATION BUILDING USING THE HOUSE OF RISK METHOD: Delay Risk Mitigation in Surgical Building Construction”, Suranaree Journal of Science and Technology, 32(6), pp. 010384(1–12). doi: 10.55766/sujst8738.