Rani, H., Syammaun, T., Rachman , F., & Cahyadi, A. (2025). ANALYSIS AND MITIGATION OF DELAY RISKS IN THE CONSTRUCTION OF THE CENTRAL SURGICAL INSTALLATION BUILDING USING THE HOUSE OF RISK METHOD: Delay Risk Mitigation in Surgical Building Construction. Suranaree Journal of Science and Technology, 32(6), 010384(1–12). https://doi.org/10.55766/sujst8738