(1)
Rani, H.; Syammaun, T.; Rachman , F.; Cahyadi, A. ANALYSIS AND MITIGATION OF DELAY RISKS IN THE CONSTRUCTION OF THE CENTRAL SURGICAL INSTALLATION BUILDING USING THE HOUSE OF RISK METHOD: Delay Risk Mitigation in Surgical Building Construction. Suranaree J Sci Technol 2025, 32, 010384(1-12).