[1]
Rani, H., Syammaun, T., Rachman , F. and Cahyadi, A. 2025. ANALYSIS AND MITIGATION OF DELAY RISKS IN THE CONSTRUCTION OF THE CENTRAL SURGICAL INSTALLATION BUILDING USING THE HOUSE OF RISK METHOD: Delay Risk Mitigation in Surgical Building Construction. Suranaree Journal of Science and Technology. 32, 6 (Nov. 2025), 010384(1–12). DOI:https://doi.org/10.55766/sujst8738.